How many hours a week is the DuPont schedule?
It averages 42 scheduled hours a week with 12-hour shifts, but individual weeks range from 0 to 72 hours: 48, 72, 48 and 0 across the four weeks of the cycle.
Guides · Shift pattern guide
The DuPont schedule is a 28-day rotation of 12-hour shifts: four night shifts, three days off, three day shifts, one day off, three night shifts, three days off, four day shifts, then seven days off in a row. Each worker averages 3.5 shifts a week, and four crews together cover every hour of the week.
The DuPont schedule, usually credited to the chemical company of the same name, mixes day and night blocks inside one four-week cycle. Each worker has 14 shifts in 28 days: seven nights and seven days. Four crews start the cycle one week apart, so every day and every night always has one crew on duty.
Weekly hours vary a lot. Starting on a Monday, week 1 has four shifts, week 2 has six, week 3 has four and week 4 has none. With 12-hour shifts that is 48, 72, 48 and 0 scheduled hours, or 42 hours a week on average.
The table shows one full cycle starting on a Monday, which is how RotaLark's built-in DuPont rotation begins.
| Week | Mon | Tue | Wed | Thu | Fri | Sat | Sun |
|---|---|---|---|---|---|---|---|
| Week 1 | Night | Night | Night | Night | Off | Off | Off |
| Week 2 | Day | Day | Day | Off | Night | Night | Night |
| Week 3 | Off | Off | Off | Day | Day | Day | Day |
| Week 4 | Off | Off | Off | Off | Off | Off | Off |
Because the cycle is exactly four weeks, the same weekdays line up every cycle. Week 4 is the seven-day break that makes DuPont popular. The hardest moment is in week 2, when one day off separates the end of a day block from the start of a night block.
The built-in rotation starts at the first night block. If your crew is at a different point in the cycle, scan or type your actual rota rows on the import screen; see the rota scanning guide.
In version 1, shift times come from RotaLark's built-in definitions: day shifts run 07:00 to 19:00 and night shifts 19:00 to 07:00, each with a 60-minute unpaid break, so every 12-hour shift counts as 11 paid hours. You can change the hourly rate and pay multiplier for each shift type in Settings, but not the start and end times.
Because half of the DuPont shifts are nights, it helps to see them separately. RotaLark's Insights tab counts night shifts for each month alongside total hours and weekend shifts. With Pro, estimated gross pay applies each shift type's own rate and multiplier; night shifts start with a 1.2× multiplier, which you can change in Settings to match your contract.
The shift pay calculator guide walks through the formula with a worked example.
If you prefer a rota that repeats every two weeks, compare the Panama 2-2-3 schedule.
It averages 42 scheduled hours a week with 12-hour shifts, but individual weeks range from 0 to 72 hours: 48, 72, 48 and 0 across the four weeks of the cycle.
Once every 28 days, straight after the block of four day shifts. In a cycle that starts on a Monday, it is the whole of week 4.
Yes. Insights shows the number of night shifts in each month. With Pro, pay estimates use the night shift's own rate and multiplier.
The built-in rotation always starts at the first night block on the coming Monday. To start at another point, import your rota rows instead, or adjust days with Quick assign.
A private, offline-first shift calendar with on-device rota scanning. Manual entry stays free. Pro adds unlimited on-device rota scans, every built-in rotation, estimated pay, and advanced insights.
Coming to iPhone